Grumpy Luxury Motor Yacht Maintenance History

Grumpy

Grumpy

Length: 26.52m  (87'0"ft) / Guests: 8 / Built: 2004

MAINTENANCE HISTORY

2016

Navy blue hull side paint job
Waste treatment system added
Noverania tender added
Interior refit including carpet, sofas, soft goods and décor
Second aft deck buffet station with storage added
New washing machine
New Garmin 7612 added to pilot house electronics to replace Furuno VX2
Custom closet added in master stateroom

2014/2015

Full survey conducted 11/14
engine survey done 11/14 complete with oil samples, and even an internal BORE SCOPE
W 4 5000 hour engine preventative maintenance services complete, per survey (1/15)
All air handlers in vessel removed, professionally clean, de scaled and re installed (1/15)
Yearly complete underwater maintenance performed including fresh bottom paint, cutlass bearings, and shaft seals (1/15)
Anchor and chain dropped, inspected and serviced (1/15)

2012/2013 Upgrades and Maintenance

Galley

New refrigerator
New cooktop
New air handler
New faucet

Salon

New coffee table
New mirror
New rope lighting
New outlets and switches (vimar)
New a/v equipment
Installed printer
Apple TV
New refrigerator
New decorations
New glass doors

Staterooms

New rope lighting
New switches and outlets
Custom stainless rails throughout
New overhead lighting

Pilothouse

New electronic displays
Installed AIS
Updated chart plotting software
Installed 2 new VHF radios
New rope lighting
New stabilizer parts (brain box, display, servos, pistons, seals)
Wave Wi­Fi amplifier installation

Bridge

New displays in console
Networked black box radar to bridge
Complete redo of console
(2) New ram mic VHF radios
New TV mount
New curtains (EZ2CY) designed to be opened to make the bridge open air
New rear curtain over freezer
Modified bench seating for rod storage
Complete re­modification of chest freezer
Complete re­modification of bar
Custom granite counter tops of bar
Table top re­done
New speakers and amp for bridge
New davit motor/pump
Custom stainless rail extensions with modification to make level

Exterior

New paint job of complete boat
Teak sanding
Chromed horns
New running lights
Varnish work on rail
New storm lights around boat
Flushed air boxes
New air box fire damper cables
New bow cushions
New exterior covers for all tables and cushions for entire boat
All outdoor tables re­finished
Painted ceiling over back deck
Removed and faired railing on transom
Full passerelle service
Custom stainless rails made for passerelle
New outdoor speakers and subs and amp

Crew

Complete re­model of both crew entry ways
Custom stainless rails
Custom stainless staircase
Floor in crew re­varnished with satin awl grip
New cushions for crew galley bench
Crew galley table re­finished
Remodeled washer/dryer combo
Converted stbd lazz into dive locker
Removed cable master and modified shore power system on port side lazz
New Brownies Dive compressor with remote fill panel in transom

Engine Room

New regulator for cooling tower on chill water system
Upgraded water maker from 800gpd to 1800gpd (new high pressure pump, new membranes, re­located membranes for quieter operation, new filters)
New bulbs for UV water sterilizer
New air filters for engines
New water pumps on engines
Modified discharge layout of fire extinguishing system in engine room
Continuous maintenance of all engines and equipment in engine room (including all filters, zincs, sea strainers etc.)
New freezer pump
New aux hydraulic cooling pump
New bronze a/c raw water impeller
New 8D batteries for generators
Installed 2 new toolboxes over motors

Other Notes

Completed full annual MCA/ MINI­ISM certification
Full Fire re­certification Nov 12’
Life raft re­certification Sep 12’
Regular annual a/c maintenance
New bottom Job in Nov 12’
Props checked and balanced Aug 12’
Prop speed props and thruster props and engine intakes, uw lights Nov 12’
New zincs

Miscellaneous 2011 Upgrades

New teak decks on entire vessel

Interior 2010 Upgrades

Completely new interior…soft goods, carpets, mattresses, furniture, granite etc... New updated audio visual systems in all rooms, salon, fly bridge and aft deck
Brand new over/under Bosch washer and dryer
New galley compactor
Replaced/rebuilt entire black water system including toilets
Holding tank capacity doubled from 100 to 200 gallons

Mechanical 2010 Upgrades

W­4 service performed on both main engines
Engines and entire engine room painted in white Awlgrip
New diamond plating added to engine room
Both generators had complete ZERO HOUR rebuilds
All air conditioning chillers removed, serviced, painted and replaced
Davit rebuilt
Rebuilt steering rams
Fuel polishing system added

Miscellaneous 2010 Upgrades

Extensive Marshall Islands charter certification
Eight underwater light added, four across transom, two up each side
Custom serving bar and storage cabinet built for aft deck area
New rub rail
All new exterior cushions and covers
New night vision/security cameras added on side decks and engine room
Updated plotting computer, nobletec, and weather works software Fly bridge expansion for more charter conducive arrangement

Disclaimer: These particulars are a general guide to give a broad description of the yacht. They are not intended to constitute part of an offer or contract. All photographs, measurements, plans and specifications referred to are given as a guide only and should not be relied upon for the purchase or charter of this yacht. The copyright of all details, photographs and deckplans remains the property their respectful owners.